Justification of bulldozer stripping work depth when developing deep placers

https://doi.org/10.21285/2541-9455-2019-42-1-55-63

Abstract

The purpose of this study is development of a method for determining the economically feasible boundary of the use of a bulldozer stripping method for various mining conditions. Mining and technical conditions of the placers developed today are gradually deteriorating as the depth of stripping works is constantly increasing. More and more often after peat removal a combined method of stripping works is applied where the upper part is mined by bulldozers and the lower one by stripping shovels. In this case, the vertical boundary between these methods is often established without sufficient justification. Determination of the rational correlation ratio of the amount of works performed by bulldozers and stripping shovels will allow to solve the problem of reducing the costs of stripping works at deep alluvial deposits. This paper presents a methodology for the economic substantiation of the depth of bulldozer stripping works taking into account the cost of stripping works performed by different equipment. The study uses a grapho-analytical method. Nomograms have been developed for determining the cost of stripping operations for a bulldozer and a stripping shovel depending on placer parameters and the relief of the adjacent surface, which enable prompt determination of an economically feasible boundary of stripping shovel mining application. The proposed methods also allow a reasonable distribution of peat volumes stored on different sides of the mine. Therefore, the use of this procedure will reduce the cost of stripping works in the development of deep alluvial deposits when the combined stripping method is used including the removal of the upper part by bulldozers, and the lower one by stripping shovels.

About the Authors

B. L. Talgamer
Irkutsk National Research Technical University
Russian Federation

Dr. Sci. (Eng.), Professor, Head of the Department of Mineral Deposit Development of the Institute of Subsoil Use

Irkutsk



E. A. Dorosh
Irkutsk National Research Technical University
Russian Federation

Student

Irkutsk



References

1. Results of the gold mining industry in 2017. Zoloto i tekhnologii [Gold and Technologies], 2018, no. 1 (39), рр. 6–13. (In Russ.).

2. Lunyashin P.D. Gold resources of Russia. Zolotodobycha [Gold Mining], 2013, no. 8, рр. 32–34. (In Russ.).

3. Tal'gamer B.L., Ershov V.A., Tyutrin S.T. State and development prospects of dredging gold production in the Irkutsk region. Zolotodobycha [Gold Mining], 2016, no. 12 (217), рр. 11–14. (In Russ.).

4. Surenkov V.S. Raw materials base of the Russian gold mining industry: the state, problems and ways of development. Ratsional'noe osvoenie nedr [Mineral Mining & Conservation], 2017, no. 3, рр. 16–19. (In Russ.).

5. Emel'yanov A.I. Tekhnologiya bul'dozernoi razrabotki vechnomerzlykh rossypei [Bulldozer development technology of permafrost placers]. Moscow: Nedra Publ., 1976, 287 p. (In Russ.).

6. Kostromitinov K.N., Lyskov V.M. Otsenka effektivnosti otrabotki mestorozhdenii dragotsennykh metallov [Evaluation of mining efficiency of precious metal deposits]. Irkutsk: Baikal State University of Economics and Law Publ., 2015, 530 р. (In Russ.).

7. Shorokhov S.M. Tekhnologiya i kompleksnaya mekhanizatsiya razrabotki rossypnykh mestorozhdeniya [Technology and complex mechanization of placer deposit development]. Moscow: Nedra Publ., 1973, 768 p. (In Russ.).

8. Leshkov V.G. Razrabotka rossypnykh mestorozhdenii [Placer development]. Moscow: Gornaya kniga Publ., 2007, 906 р. (In Russ.).

9. Tomakov P.I., Naumov I.K. Tekhnologiya, mekhanizatsiya i organizatsiya otkrytykh gornykh rabot [Technology, mechanization and organization of open pit mining]. Moscow: Nedra Publ., 1986, 312 р. (In Russ.).

10. Rzhevskii V.V. Otkrytye gornye raboty [Open cast mining]. Part 1. Moscow: Nedra Publ., 1985, 509 р. (In Russ.).


Review

For citations:


Talgamer B.L., Dorosh E.A. Justification of bulldozer stripping work depth when developing deep placers. Earth sciences and subsoil use. 2019;42(1):55-63. (In Russ.) https://doi.org/10.21285/2541-9455-2019-42-1-55-63

Views: 362


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2686-9993 (Print)
ISSN 2686-7931 (Online)